Just started building the test frame, I don’t have a facility to test so I will create a stand and weight it down with sandbags. I still need to put the strengthening supports on but just getting it on the stand is pretty exciting. Still need to finish the control board, finish wiring and hooking up fuel and oxidizer tanks. I am also building a control station with a 500 foot line so I can stay far enough away to stay safe. Little by little I am making progress, I just have to take my time and not rush the finishing steps to make everything as safe as possible.